{"data":[{"qt_id":"1","qt_title":"Redecoration Water Damage","qt_description":"To allow to attend the above site with all necessary plant\/materials and carry out protection works as required,
\r\n
\r\nTo carry out preparation works to water damaged areas scrape back, apply stain sealer, fill and make good. Apply 2No: coats of colour match emulsion.
\r\n
\r\nRemove all protection and clean all working areas on completion.","qt_price":"0.00","qt_category":"Decorating"},{"qt_id":"2","qt_title":"Boiler Replacement (Horizontal Flue)","qt_description":"To allow for a qualified Gas Safe engineer to attend the above site and carry out protection works as required.
\r\n
\r\nTo isolate supplies to defective existing boiler, drain down system, disconnect, remove and dispose of environmentally friendly at waste transfer station.
\r\n
\r\nSupply and install new boiler complete with horizontal flue kit and associated boiler plus compliance controls, to comply to BS 7593: carry out alteration works to pipework to suit new configuration, connect, test and commission.
\r\n
\r\n Complete Benchmark, register boiler with the manufacture and Gas Safe and provide Landlord's Certification on completion.","qt_price":"0.00","qt_category":"Gas & Heating"},{"qt_id":"3","qt_title":"Cherry Picker","qt_description":"To gain access to all high level guttering, valleys, hopper heads and outlets by means of a lorry-mounted MEWP complete with IPAF operated driver and all associated licenses, permits and road traffic management in place.
\r\n
\r\nTo investigate\/trace the cause of water ingress into the demise and allow to carry out any minor maintenance works whilst on site, remove all debris from drainage system, check all outlets and water test, to leave all free flowing on completion.
\r\n
\r\nFor any major defects found upon inspection a full report will be provided with associated costings.","qt_price":"0.00","qt_category":"Access All Heights (MEWP)"},{"qt_id":"4","qt_title":"Boiler & Heating Power Flush","qt_description":"To allow for a qualified heating engineer to attend the above site with all necessary plant\/materials and carry out protection works as required.
\r\n
\r\nTo make safe isolation to heating system and carry out a full power flush and the descaling of the central heating infrastructure with the use of a chemical solution in order to restore the system's efficiency.
\r\n
\r\n Leave inhibitor chemical within system on completion for long term protection against corrosion and scale. Commission and leave all in working order.","qt_price":"0.00","qt_category":"Plumbing & Heating"},{"qt_id":"5","qt_title":"Floor Refurbishment","qt_description":"To allow to attend the above site with all necessary plant and materials and carry out protection works as required.
\r\n
\r\nTo use a light chemical solution to strip back existing flooring. Sand through various grits to a fine finish, thoroughly vacuum and prepare.
\r\n
\r\nApply one coat of primer followed by three coats of water based quick drying, high traffic clear top seal, and buff between coats as necessary.
\r\n
\r\nRemove all protection works and clean through on completion.","qt_price":"0.00","qt_category":"Flooring"},{"qt_id":"6","qt_title":"Tap Replacement","qt_description":"To allow for a qualified engineer to attend the above site with all necessary plant and materials.
\r\n
\r\nTo isolate supplies to existing defective unit disconnect, remove and dispose of environmentally friendly.
\r\n
\r\nSupply and install new, connect, test and commission on completion.","qt_price":"0.00","qt_category":"Plumbing & Heating"},{"qt_id":"7","qt_title":"Redecoration Full","qt_description":"To allow for a decorating team to attend the above site and carry out all necessary protection works as required.
\r\n
\r\nTo carry out preparation works to all ceilings, walls and woodwork throughout.
\r\n
\r\nApply 2no coats of colour match emulsion to ceilings and walls, undercoat all woodwork followed by 1No: top coat.
\r\n
\r\nRemove all protection works and clean site on completion.","qt_price":"0.00","qt_category":"Decorating"},{"qt_id":"8","qt_title":"Rubbish Clearance - Tenant","qt_description":"To allow to attend the above site and carefully remove all unwanted items left by previous tenant and dispose of environmentally friendly at waste transfer station as directed.
\r\n
\r\nTo also allow a provisional sum of \u00a3___ for waste transfer charges.","qt_price":"0.00","qt_category":"Waste Clearance"},{"qt_id":"9","qt_title":"Rubbish Clearance","qt_description":"To allow to attend the above site with all necessary plant and PPE
\r\n
\r\nTo carefully remove all waste from site as directed, cart away and dispose of environmentally friendly at waste transfer station. To leave all areas clean and tidy on completion.
\r\n
\r\nTo also allow a provisional sum of \u00a3___ for waste transfer charges.","qt_price":"0.00","qt_category":"Waste Clearance"},{"qt_id":"10","qt_title":"Door Replacement","qt_description":"To allow to attend the above site with all necessary plant\/materials and carry out protection works as required.
\r\n
\r\nCarefully remove existing defective door and set a side all ironmongery for re-use.
\r\nSupply and install new half hour fire rated door back to aperture and re-instate all previously removed ironmongery. Allow to apply 1No:prime coat, followed by 2No: colour match top coats, all to match existing.
\r\n
\r\nRemove all waste and dispose of environmentally friendly at waste transfer site on completion. ","qt_price":"0.00","qt_category":"Carpentry & Joinery"},{"qt_id":"11","qt_title":"Air Con Service.","qt_description":"To allow for a Qualified FGAS Refrigeration engineer to attend the above site with all necessary plant and materials. Carry out protection works as required.
\r\n
\r\nTo carry out a full service to the Air Conditioning system.
\r\nClean indoor and outdoor units inclusive of coils as required.
\r\nClean internal unit filters and fan blades.
\r\nDisinfect internal unit coil.
\r\nFlush through condensate drainage
\r\nCheck correct function to controls, inclusive of fan speeds, grille adjustment mode change.
\r\nInspect all electrical connections.
\r\nTemperature checks in both cooling and heating.
\r\nCheck refrigerant charge and running pressures.
\r\nEnsure outdoor electrical isolator is weatherproof and in good condition.
\r\nCheck systems running currents during test performance.
\r\nIssue certification and report on completion.
\r\nEnsure F Gas log is up to date where applicable.
\r\n","qt_price":"0.00","qt_category":"Air Conditioning"},{"qt_id":"12","qt_title":"Roof Drainage Service MEWP","qt_description":"To allow for a two man harness and working at heights drainage team, to attend the above site and gain safe access to all roof levels. Working with a configuration of plant incorporating an IPAF operator MEWP, mobile scaffold tower, ladders and an industrial gutter sky-vac.
\r\n
\r\nTo carry out maintenance inspections to the drainage infrastructure, remove and clear all debris from valleys, hopper-heads, clear all outlets removing any blockages and residues to allow all free flowing. To also carry out any minor maintenance works whilst on site.
\r\n
\r\nDispose of all waste material environmentally friendly on completion.
\r\n
\r\nReddan to report back on any major defects with associated images and recommendations.
\r\n
\r\n ","qt_price":"0.00","qt_category":"Drainage"},{"qt_id":"13","qt_title":"Under Slab Drainage Service","qt_description":"To allow for a two man drainage team to attend the above site, complete with commercial vehicle mounted high pressure drainage unit, sewer router and electro mechanical de-scale cleaning machine and all associated manhole lifting plant.
\r\n
\r\nTo set up site complying to all necessary health and safety measures meeting the requirements of previously issued RAMS with the use of cones\/barriers in order to provide a duty of care to the public.
\r\n
\r\nTo gain access to all accessible under slab drainage via access chambers and connecting runs.
\r\n
\r\nWith the use of high pressure jetting equipment, allow to jet through main drains and gullies through to connection with main interceptor to ensure all runs are to full flow, removing any blockages and residues.
\r\n
\r\nAll manhole covers to be re-sealed and all associated waste to be removed and disposed of environmentally correctly. All working areas to be left clean and tidy on completion. Reddan to report of any defects found or suspected within the drainage system. ","qt_price":"0.00","qt_category":"Drainage"},{"qt_id":"14","qt_title":"EICR Testing","qt_description":"To allow for a qualified 18th edition electrical engineer to attend the above site, complete with required calibrated testing equipment.
\r\n
\r\nTo carry out a full Electrical Installation Condition Report (EICR) in accordance with BS7671: and issue an approved NICEIC certification on completion.
\r\n
\r\nTo leave the installation in a safe condition.
\r\n
\r\nShould any remedial works be required in order to meet a satisfactory standard a further quotation will be submitted.
\r\n","qt_price":"0.00","qt_category":"EICR Testing"},{"qt_id":"15","qt_title":"Heating Replacement Parts.","qt_description":"To allow for a qualified Gas Safe engineer to attend the above site and carry out the safe isolation to the heating system and drain down as required.
\r\n
\r\nCarefully remove defective valve, supply and install new. Refill system inclusive of inhibitor and reinstate to full capacity.
\r\n
\r\nTest and commission and leave working correctly on completion.
\r\n
\r\n","qt_price":"0.00","qt_category":"Gas & Heating"},{"qt_id":"16","qt_title":"Electrical Lamps\/Fittings Replacement","qt_description":"To allow for a qualified 18th edition electrical engineer to attend the above site with all necessary plant\/materials and access equipment.
\r\n
\r\nTo carry out the safe isolation to the electrical lighting circuit, carefully remove spent lamps\/fittings as required and dispose of environmentally friendly.
\r\n
\r\nTo supply and install new replacement lamps\/fittings and re-instate supply.
\r\n
\r\nTest and commission on completion.","qt_price":"0.00","qt_category":"Electrical"},{"qt_id":"17","qt_title":"Access Panels","qt_description":"To allow to attend the above site with all necessary plant\/materials and access equipment. Carry out protection works as required.
\r\n
\r\nTo carefully construct an opening within the ceiling area to enable additional access and install pre-finished removable panel for future maintenance.
\r\n
\r\nRemove all protection works and leave all working areas clean on completion. ","qt_price":"0.00","qt_category":"General Maintenance"},{"qt_id":"18","qt_title":"Glazing","qt_description":"To allow for a qualified glazing team to attend the above site with all necessary plant\/materials and access equipment, carry out protection works as required.
\r\nCarefully remove defective glazing and prepare. Supply and install new Carry out re-instatement works of newly glazed window.
\r\n
\r\nAllow to make good any disturbed surfaces. Remove all protection works and all associated waste, leave all working areas clean and tidy on completion.","qt_price":"0.00","qt_category":"Glazing & Boarding"},{"qt_id":"19","qt_title":"Redecoration Shop Front ","qt_description":"To allow to attend the above site with all necessary plant\/materials and access equipment and set up site with the use of cones, barriers, hazard tape and associated signage, in order to provide a safe cordon whilst works are being carried out.
\r\n
\r\nTo prepare all surfaces as required to door\/frame and complete surround as directed and apply 2No: coats of exterior colour match paint.
\r\n
\r\nRemove all protection works and leave all working areas clean and tidy on completion.
\r\n
\r\n","qt_price":"0.00","qt_category":"Decorating"},{"qt_id":"20","qt_title":"Landlords Gas Safety Inspection","qt_description":"To allow for a qualified Gas Safe engineer to attend the above site complete with required calibrated testing equipment.
\r\n
\r\nTo carry out a Landlords gas safety inspection and issue certification on completion.
\r\n
\r\nTo leave the installation in a safe condition.
\r\n
\r\nShould any remedial works be required in order to meet a satisfactory standard a further quotation will be submitted. ","qt_price":"88.00","qt_category":"Gas Testing"},{"qt_id":"21","qt_title":"Alarm replacements (smoke)","qt_description":"To allow for a competent engineer to attend the above site and carry out all necessary protection works as required.
\r\n
\r\nTo supply and install correctly located smoke alarms to manufacturers instructions, in accordance with BS5839:
\r\n
\r\nTest and commission on completion. ","qt_price":"0.00","qt_category":"General Maintenance"},{"qt_id":"22","qt_title":"Appliances.","qt_description":"To allow for an appliance engineer to attend the above site and make safe isolation to the existing defective appliance. Cart away and dispose of environmentally friendly at specialist waste transfer site.
\r\n
\r\nTo supply and install new, connect , test and commission on completion.
\r\n
\r\n","qt_price":"0.00","qt_category":"Appliances"},{"qt_id":"23","qt_title":"Flooring Vinyl.","qt_description":"To allow to attend the above site with all necessary plant\/materials and carry out protection works as required.
\r\n
\r\nTo carefully uplift existing defective vinyl floor covering, cart away and dispose of environmentally friendly at waste transfer site.
\r\n
\r\nTo allow to carry out localised repairs to sub flooring, apply primer and one coat latex screed smoothing compound. Supply and install new similar match Altro safety vinyl back to area and apply mastic seals as necessary.
\r\n
\r\nRemove all protection works and associated waste and leave all working areas clean and tidy on completion. ","qt_price":"0.00","qt_category":"Flooring"},{"qt_id":"24","qt_title":"PAT","qt_description":"To allow for a competent trained engineer to attend the above site complete with required calibrated testing equipment.
\r\n
\r\nTo carry out a complete Electrical Equipment Testing (EET) compliance procedure to all responsible electrical equipment In accordance with BS 7671
\r\n
\r\nTo issue approved certification on completion.
\r\n
\r\nTo leave all appliances in a safe and reliable condition.
\r\n
\r\nShould any remedial works be required in order to meet a satisfactory standard a further quotation will be submitted.
\r\n
\r\n","qt_price":"0.00","qt_category":"PAT (EET)"},{"qt_id":"25","qt_title":"Alarm Replacement (CO)","qt_description":"To allow for a competent engineer to attend the above site and carry out all necessary protection works as required.
\r\n
\r\nTo supply and install correctly located carbon monoxide alarms with a sealed ten year battery pack to manufacturers instructions, in accordance with BS EN 50292:
\r\n
\r\nTest and commission on completion. ","qt_price":"0.00","qt_category":"General Maintenance"},{"qt_id":"26","qt_title":"Alarm replacement (combined)","qt_description":"To allow for a competent engineer to attend the above site and carry out all necessary protection works as required.
\r\n
\r\nTo supply and install correctly located combined smoke and carbon monoxide alarms with a sealed ten year battery pack to manufacturers instructions, in accordance with BS EN 50292:
\r\n
\r\nTest and commission on completion. ","qt_price":"0.00","qt_category":"General Maintenance"},{"qt_id":"27","qt_title":"Boiler Service","qt_description":"To allow for a qualified Gas Safe engineer to attend the above site complete with calibrated testing equipment and full service packs as per manufactures specification as required.
\r\n
\r\n
\r\nTo make safe isolation to boiler and carry out a full service in accordance with BS 7593:
\r\n
\r\nTo carry out visual checks to the boiler, flue, pipework and controls.
\r\nCheck that the system is operating correctly.
\r\nExamine all components.
\r\nCheck gas pressure and flow.
\r\nEnsure burner pressure is correct.
\r\nInspect flue and combustion.
\r\nCheck electrical connections are clean and in good condition.
\r\nFans and other key components are working efficiently.
\r\nReplace seals\/gaskets as required.
\r\nInspect burner and clean as necessary.
\r\nCheck safety devices are operating correctly and conform to safety legislation.
\r\nFlush through condensate trap and check pipework all free flowing.
\r\n
\r\nTo reinstate system to full capacity and leave in a safe and reliable condition.
\r\n
\r\nTest, commission and issue service inspection report on completion.","qt_price":"0.00","qt_category":"Gas & Heating"},{"qt_id":"28","qt_title":"Shower Control Valve.","qt_description":"To allow for a qualified engineer to attend the above site with all necessary plant\/materials and carry out protection works as required.
\r\n
\r\nTo make safe isolation to the existing shower unit, disconnect and carefully remove defective valve. Supply and install new, connect, test and commission on completion.","qt_price":"0.00","qt_category":"Plumbing & Heating"},{"qt_id":"29","qt_title":"Redecoration Ceiling and Walls Only","qt_description":"To allow for a decorating team to attend the above site and carry out all necessary protection works as required.
\r\n
\r\nTo carry out preparation works to all ceilings and walls throughout.
\r\n
\r\nApply 2no coats of colour match emulsion as directed.
\r\n
\r\nRemove all protection works and clean site on completion.","qt_price":"0.00","qt_category":"Decorating"},{"qt_id":"30","qt_title":"Electrical Fuse Box Replacement","qt_description":"To allow for a qualified 18th edition electrical engineer to attend the above site with required calibrated testing equipment and materials. To carry out visual checks and testing as required to the existing circuits, in order to determine the initial verification of the installation is reliably connected to a suitable means of earthing.
\r\n
\r\nTo make safe isolation to the existing distribution board and carefully remove all circuits. To supply and install new consumer board complete with RCD fault protection to accessible location to facilitate its operation in accordance to BS 7671. Re-instate all previously removed circuits and re-energise. Provide correct labelling to newly installed consumer board.
\r\n
\r\nTest, commission and issue approved NICEIC electrical installation certificate (EIC) on completion.
\r\n
\r\n","qt_price":"0.00","qt_category":"Electrical"},{"qt_id":"31","qt_title":"Roofing Repairs","qt_description":"To allow for a two man team to attend the above site with all necessary plant\/materials and access equipment.
\r\n
\r\nTo gain safe access to roof level and carry out localised maintenance repairs as required.
\r\n
\r\nClean out all gutters, valleys, outlets and water test to leave all free flowing on completion.","qt_price":"0.00","qt_category":"Roofing"},{"qt_id":"32","qt_title":"High Level Lighting (MEWP)","qt_description":"To allow for a qualified 18th edition electrical team to attend the above site with all necessary plant\/materials and access equipment.
\r\n
\r\nTo cordon of working areas with the use of cones, barriers, hazard tape and associated signage. To gain access to high level defective lighting by means of an IPAF operated MEWP and carry out the safe isolation of the electrical supply. Disconnect, remove and dispose of environmentally friendly. Supply and install new fitting, connect and test on completion.
\r\n
\r\n","qt_price":"0.00","qt_category":"Electrical"},{"qt_id":"33","qt_title":"High Level Lighting (Scaffold)","qt_description":"To allow for a qualified 18th edition electrical team to attend the above site with all necessary plant\/materials and access equipment.
\r\n
\r\nTo cordon of working areas with the use of cones, barriers, hazard tape and associated signage. To gain access to high level defective lighting by means of a mobile scaffold tower and carry out the safe isolation of the electrical supply. Disconnect, remove and dispose of environmentally friendly. Supply and install new fitting, connect and test on completion. ","qt_price":"0.00","qt_category":"Electrical"},{"qt_id":"34","qt_title":"Toilet Replacement parts.","qt_description":"To allow for a qualified engineer to attend the above site with all necessary plant and materials.
\r\n
\r\nTo isolate supplies to the toilet and carefully remove defective mechanism and dispose of environmentally friendly.
\r\n
\r\n Supply and install new, connect, test and commission on completion. ","qt_price":"0.00","qt_category":"Plumbing & Heating"},{"qt_id":"35","qt_title":"Window Replacement","qt_description":"To allow to attend the above site and carefully remove defective window from frame and install a temporary secure board in place.
\r\n
\r\nAllow to manufacture new bespoke window incorporating glazed unit, all to match existing.
\r\n
\r\nReturn to site and carry out protection works as required, to install new window and carry out minor adjustments to suit existing frame.
\r\n
\r\nAllow to prime all bare timbers followed by 1No: undercoat and 1No: colour match top coat.
\r\n
\r\nRemove all protection works and associated waste, to leave working area clean and tidy on completion.","qt_price":"0.00","qt_category":"Carpentry & Joinery"},{"qt_id":"36","qt_title":"Door Replacement (Bespoke)","qt_description":"To allow to manufacture bespoke solid core half hour fire rated door, all to be in-keeping with existing.
\r\n
\r\nTo allow to attend the above site and carry out protection works as required. Carefully remove existing defective door setting aside all ironmongery for re-use.
\r\n
\r\nInstall newly manufactured door back to aperture and re-instate all ironmongery.
\r\n
\r\nAllow to apply 1No:prime coat, followed by 2No: colour match top coats, all to match existing.
\r\n
\r\nRemove all waste from site and dispose of environmentally friendly at waste transfer site on completion.","qt_price":"0.00","qt_category":"Carpentry & Joinery"},{"qt_id":"37","qt_title":"Boiler Flue Works","qt_description":"To allow for a qualified Gas Safe engineer to attend the above site complete with calibrated testing equipment and carry out all necessary protection works as required.
\r\n
\r\nTo carry out safe isolation to the boiler, carefully remove sections of flue and carry out repairs as required and install new seals. Reinstate flue, test and commission with the use of a flue gas analyser in order to achieve correct and efficient combustion all to meet manufactures instructions.
\r\n
\r\nTo leave system in a safe and reliable condition on completion. ","qt_price":"0.00","qt_category":"Gas & Heating"},{"qt_id":"38","qt_title":"Blind Replacements","qt_description":"To allow to attend the above site and carry out all necessary protection works as required.
\r\n
\r\nTo supply and install purpose made blinds to windows as directed and leave operating correctly.
\r\n
\r\nRemove all protection works and leave areas clean and tidy on completion.","qt_price":"0.00","qt_category":"General Maintenance"},{"qt_id":"39","qt_title":"Electrical Check Meters.","qt_description":"To allow for a qualified 18th edition electrical engineer to attend the above site, complete with required calibrated testing equipment.
\r\n
\r\nTo carry out the safe isolation to the main electrical supply and install new check meter as directed.
\r\n
\r\nConnect, test and commission on completion.
\r\n
\r\n","qt_price":"0.00","qt_category":"Electrical"},{"qt_id":"40","qt_title":"Flooring Tiled","qt_description":"To allow to attend the above site with all necessary plant\/materials and carry out protection works as required.
\r\n
\r\nTo carefully uplift existing defective tiled floor, cart away and dispose of environmentally friendly at waste transfer site.
\r\n
\r\nTo allow to carry out localised repairs to sub flooring, supply and install new similar match tiles back to area allow to set and apply grout and mastic seals as necessary.
\r\n
\r\nRemove all protection works and associated waste and leave all working areas clean and tidy on completion.
\r\n
\r\n ","qt_price":"0.00","qt_category":"Tiling"},{"qt_id":"42","qt_title":"Permits and Licences","qt_description":"To allow for the City of Westminster Councils mandatory permits and licences to be obtained, for a temporary mobile tower structure to be in place, to enable works to be carried out in a safe and compliant manner.","qt_price":"0.00","qt_category":"General Maintenance"},{"qt_id":"43","qt_title":"Shower Enclosure","qt_description":"To allow to attend the above site and carry out all necessary protection works as required.
\r\n
\r\nCarefully remove existing defective shower enclosure\/screen, cart away and dispose of environmentally friendly at waste transfer site.
\r\n
\r\nTo supply and install new back to position and carry out adjustments and apply mastic seals as required.
\r\n
\r\nRemove protection works and associated waste. Leave all working areas clean and tidy on completion.","qt_price":"0.00","qt_category":"General Maintenance"},{"qt_id":"44","qt_title":"Air Handling Unit (AHU)","qt_description":"To allow for a qualified engineer to attend the above site with all necessary plant\/materials and access equipment. Carry out protection works as required.
\r\n
\r\nTo make the safe isolation to all Air handling units and carry out a full service inclusive of external condenser.
\r\n
\r\nCarefully remove extraction grills, inspect filters and clean\/replace as necessary.
\r\nTo clean coils and fan blades
\r\nLubrication of bearings and motors.
\r\ninspection of belts.
\r\nVisual check to all electrical connections.
\r\ncheck correct function of controllers inclusive of fan speeds.
\r\nOverall system performance checks.
\r\n
\r\nTest operation and leave in full working order on completion.","qt_price":"0.00","qt_category":"AHU"},{"qt_id":"45","qt_title":"General Maintenance (Basic)","qt_description":"To allow to attend the above site with all necessary plant\/materials and carry out protection works as required.
\r\n
\r\n
\r\n
\r\n
\r\nRemove all protection works and leave all working areas clean and tidy on completion.","qt_price":"0.00","qt_category":"General Maintenance"},{"qt_id":"47","qt_title":"Shower Tray Replacement","qt_description":"To allow to attend the above site with all necessary plant\/materials and carry out protection works as required.
\r\n
\r\nCarefully remove existing shower enclosure and set a side for reuse, remove bottom row of tiles, disconnect and remove defective shower tray as directed. Cart away and dispose of environmentally friendly at waste transfer site.
\r\n
\r\nTo supply and install new 25mm stone resin tray back to position, connect to waste and water test. Supply and install new tiles back to previously removed area allow to set, grout and apply mastic seals as required, all to match existing. Re-instate shower enclosure and seal.
\r\nRemove protection works and associated waste. Leave all working areas clean and tidy on completion.","qt_price":"0.00","qt_category":"Plumbing & Heating"},{"qt_id":"48","qt_title":"Air Con Replacement Parts.","qt_description":"To allow for a Qualified FGAS Refrigeration engineer to attend the above site with all necessary plant and materials. Carry out protection works as required.
\r\n
\r\nTo make the safe isolation to the unit, carefully disconnect remove defective mechanical part and dispose of environmentally friendly.
\r\n
\r\nSupply and install new, test, pump through and commission on completion. ","qt_price":"0.00","qt_category":"Air Conditioning"},{"qt_id":"49","qt_title":"Flooring Wood","qt_description":"To allow to attend the above site with all necessary plant\/materials and carry out protection works as required.
\r\n
\r\nTo carefully uplift existing defective wood floor, cart away and dispose of environmentally friendly at waste transfer site.
\r\n
\r\nTo allow to carry out localised repairs to sub flooring, supply and install new similar match engineered wood flooring back to area inclusive of all scotia beading and door threshold bars as required.
\r\n
\r\nRemove all protection works and associated waste and leave all working areas clean and tidy on completion.","qt_price":"0.00","qt_category":"Flooring"},{"qt_id":"50","qt_title":"Boiler Replacement (Vertical Flue)","qt_description":"To allow for a qualified Gas Safe engineer to attend the above site and carry out protection works as required.
\r\n
\r\nTo isolate supplies to defective existing boiler, drain down system, disconnect, remove and dispose of environmentally friendly at waste transfer station.
\r\n
\r\nSupply and install new boiler complete with vertical flue kit and associated boiler plus compliance controls, to comply to BS 7593: carry out alteration works to pipework to suit new configuration, connect, test and commission.
\r\n
\r\nComplete Benchmark, register boiler with the manufacture and Gas Safe and provide Landlord's Certification on completion.","qt_price":"0.00","qt_category":"Gas & Heating"},{"qt_id":"51","qt_title":"Emergency light remedial works","qt_description":"Following the defects identified within the report of the recently carried out emergency light testing and inspection. We have prepared the below for your consideration.
\r\n
\r\nTo allow for a qualified 18th edition electrical engineer to attend the above site with all necessary plant\/materials and access equipment.
\r\n
\r\nTo carry out the safe isolation to the electrical lighting circuit, carefully remove failed emergency light fittings as required and dispose of environmentally friendly.
\r\n
\r\nTo supply and install new replacement fittings and re-instate supply.
\r\n
\r\nTest and commission on completion.
\r\n
\r\n
\r\n","qt_price":"0.00","qt_category":"Electrical"},{"qt_id":"52","qt_title":"Emergency Light Testing","qt_description":"To allow for a competent electrical engineer to attend the above site and carry out an emergency lighting test.
\r\n
\r\nTo isolate the primary lighting circuit simulating failure of the mains power supply to ensure the lamp switches on and illuminates correctly for a period of three hours in line with BS5266-1
\r\n
\r\nCarry out a visual check to the entirety of the building to ensure that all luminaires remain lit during this time.
\r\n
\r\nRestore power and check that all light are fully operational and that the emergency lights are fully charging.
\r\n
\r\nComplete record log and report back of any defects identified.","qt_price":"0.00","qt_category":"Electrical"},{"qt_id":"53","qt_title":"EICR Remedial Works ","qt_description":"Following the defects identified within the report of the recently carried out EICR inspection. We have prepared the below for your consideration.
\r\n
\r\nTo allow for a qualified 18th edition electrical engineer to attend the above site with all necessary plant\/materials and access equipment.
\r\n
\r\nTo make safe isolation to the electrical circuits and carry out all electrical remedial works as listed within the report.
\r\n
\r\nRe-instate supplies, test\/commission and provide satisfactory certification on completion.
\r\n
\r\n","qt_price":"0.00","qt_category":"Electrical"},{"qt_id":"54","qt_title":"Redecoration Touch Up and One","qt_description":"To allow for a decorating team to attend the above site and carry out all necessary protection works.
\r\n
\r\nTo carry out preparation works to all ceilings and walls as required.
\r\n
\r\nTo allow to touch up and apply one full coat throughout.
\r\n
\r\nRemove all protection works and clean site on completion.","qt_price":"0.00","qt_category":"Decorating"},{"qt_id":"55","qt_title":"Electrical (General)","qt_description":"To allow for a qualified 18th edition electrical engineer to attend the above site with all necessary plant, materials and access equipment.
\r\n
\r\nTo carry out the safe isolation to the electrical circuits
\r\n
\r\n
\r\n
\r\nTest and commission on completion.","qt_price":"0.00","qt_category":"Electrical"},{"qt_id":"56","qt_title":"Inter-tenancy Inspection","qt_description":"To allow for a competent engineer to collect all necessary keys\/access fobs from the relevant security office and attend site.
\r\n
\r\nTo carry out a maintenance inspection throughout the demise, recording any defects identified.
\r\n
\r\nTo check if any unwanted items have been left by previous tenant.
\r\nThe condition of all ceilings, walls and woodwork.
\r\nFloor coverings are to a satisfactory standard.
\r\nAll lighting operating correctly and advise of any spent lamps.
\r\nBlinds functioning and cleats in place.
\r\n
\r\nSecurity checks to include all external and internal doors operating correctly and locks are engaging securely.
\r\nWindows and any secondary glazing are working satisfactory.
\r\n
\r\nTo inspect all kitchen units\/doors worktops etc. for damage.
\r\nTest all appliances.
\r\nEnsure sink is free flowing.
\r\n
\r\nInspect all tiling works, grouts and mastic seals are sound.
\r\nTest all taps, shower heads, hose, riser rail and shower screen seals.
\r\nExtractor fans operating correctly.
\r\n
\r\nTo check smoke and CO2 alarms are correctly installed, within date and operating correctly.
\r\n
\r\nTo enter all data complete with recommendations and report back to the Reddan helpdesk. The completed report will be issued to the instructed FM\/surveyor with quotations for further works to follow.
\r\n
\r\nThe engineer to return keys back to the security office on completion.
\r\n
\r\n","qt_price":"0.00","qt_category":"Inter-Tenancy Checks"},{"qt_id":"57","qt_title":"Flooring Carpet","qt_description":"To allow to attend the above site with all necessary plant\/materials and carry out protection works as required.
\r\n
\r\nTo carefully uplift existing defective floor covering, cart away and dispose of environmentally friendly at waste transfer site.
\r\n
\r\nTo allow to carry out localised repairs to sub flooring, supply and install new similar match carpet back to area.
\r\n
\r\nRemove all protection works and associated waste and leave all working areas clean and tidy on completion. ","qt_price":"0.00","qt_category":"Flooring"},{"qt_id":"58","qt_title":"Roof Drainage Service","qt_description":"To allow for a fully trained working at heights and harness trained drainage engineer to attend the above site and gain safe access to all accessible roof levels with the use of ladders and step ladders where applicable.
\r\n
\r\nTo carry out maintenance inspections to all drainage infrastructure. Remove and clear all debris from valleys, hopper-heads, clear all outlets removing any blockages and residues to allow all free flowing.
\r\n
\r\nDispose of all waste material environmentally friendly at waste transfer site on completion.
\r\n
\r\nReddan to report back of any major defects with associated images and recommendations.
\r\n","qt_price":"0.00","qt_category":"Drainage"},{"qt_id":"59","qt_title":"Redecoration Touch Up and Two","qt_description":"To allow for a decorating team to attend the above site and carry out all necessary protection works.
\r\n
\r\nCarry out preparation works to all walls and woodwork as required.
\r\n
\r\nTo allow to apply 2No: coats of Dulux colour match matt emulsion throughout and touch up woodwork where necessary followed by 1No: top coat.
\r\n
\r\nRemove all protection works and clean site on completion.","qt_price":"0.00","qt_category":"Decorating"},{"qt_id":"60","qt_title":"Redecoration Walls Only","qt_description":"To allow for a decorating team to attend the above site and carry out all necessary protection works as required.
\r\n
\r\nTo carry out preparation works to all walls throughout.
\r\n
\r\nApply 2no coats of colour match emulsion as directed.
\r\n
\r\nRemove all protection works and clean site on completion.","qt_price":"0.00","qt_category":"Decorating"},{"qt_id":"61","qt_title":null,"qt_description":"","qt_price":null,"qt_category":null},{"qt_id":"62","qt_title":null,"qt_description":"","qt_price":null,"qt_category":null},{"qt_id":"63","qt_title":null,"qt_description":"","qt_price":null,"qt_category":null},{"qt_id":"64","qt_title":null,"qt_description":"","qt_price":null,"qt_category":null},{"qt_id":"65","qt_title":null,"qt_description":"","qt_price":null,"qt_category":null},{"qt_id":"66","qt_title":null,"qt_description":"","qt_price":null,"qt_category":null}]}